Current Projects
Information will be forwarded to impacted residents prior to the start of construction concerning schedules and other project related information. Sign up for email updates at Projects and Capital Improvements page or contact the designated Resident Engineer with questions.
Learn more about the Capital Improvement Program.
2025 CIP Water Main Improvements, Contract A; Start Summer 2025
Point of Contact/Resident Engineer
Eric Heiker, P.E.
847-391-5617
eheiker@desplainesil.gov
| Location |
Limits |
Improvement |
| Douglas Av |
Howard Av To South Dead End |
8" Water Main; Street Reconstruction |
| Prospect Av |
Lee St To Illinois St |
8" Water Main; Street Rehabilitation |
| Sixth Av |
Greenview Av To Prairie Av |
8" Water Main; Street Rehabilitation |
2025 CIP Street Improvements, MFT 25-00231-00-RS; Start Summer 2025
Point of Contact/Resident Engineer
Becka Shipp, PE
847-391-5388
bshipp@desplainesil.gov
| Location |
Limits |
Improvement |
| Anita St |
Harvey Av To Washington St |
Resurface |
| Arlington Av |
Prairie Av To Laurel Av |
Resurface |
| Arnold Ct |
King Ln To Kinkaid Ct |
Resurface |
| Bittersweet Ct |
Mannheim Rd To Oakton St |
Resurface |
| Clark Ln |
Walnut Av To Kinkaid Ct |
Resurface |
| Columbia Av |
Anita St To Westgate Rd |
Resurface |
| Dale St |
Touhy Av To Estes Av |
Resurface |
| Evergreen Av |
Anita St To Westgate Rd |
Resurface |
| First Av |
Prairie Av To Greenview Av |
Resurface |
| Harding Av |
Anita St To Westgate Rd |
Resurface |
| Hazel Ct |
Ash St To Bittersweet Ct |
Resurface |
| Henry Av |
Center St To West Dead End |
Resurface |
| Ingram Pl |
Walnut Av To King Ln |
Resurface |
| Leahy Circle S |
Stark Pl To Clark Ln |
Resurface |
| Mary St |
Golf Rd To Redeker Rd |
Resurface |
| Munroe Circle S |
Marshall Dr To Clark Ln |
Resurface |
| N Fifth Av |
Golf Rd To North Dead End |
Resurface |
| Northshore Av |
Curtis St To Eisenhower Dr |
Resurface |
| Oakwood Av |
Center St To Lee St |
Resurface |
| Oakwood Av |
Third Av To Second Av |
Resurface |
| Orchard St |
Prospect Av To Howard Av |
Resurface |
| Parsons Av |
Prairie Av To Arlington Av |
Resurface |
| Rose Ave |
Fourth Av To First Av |
Resurface |
| Sycamore St |
Central Av To Pratt Av |
Resurface |
2025 CIP Concrete Program, 25-00000-01-GM; Start Spring 2025
Point of Contact/Resident Engineer
Daniel Koltys, FE
847-391-5390
dkoltys@desplainesil.gov
| Location |
Limits |
Improvement |
| Prospect Av/Howard Av Alley |
Pine St To Chestnut St |
Alley Improvements |
2024 CIP Stormwater Improvements, Contract C; Start Summer 2024
Point of Contact/Resident Engineer
Becka Shipp, P.E.
847-391-5388
bshipp@desplainesil.gov
| Location |
Limits |
Improvement |
| Craig Manor Park |
Craig Manor Park |
Storm Sewer Improvements |
| Madelyn Dr. |
776 Madelyn Dr. to Therese Ter. |
Storm Sewer Improvements |
| Mark Ave. |
758 Mark Ave. To Madelyn Dr. |
Storm Sewer Improvements |
2024 CIP Water Main Improvements, Contract B; Start Summer 2024
Point of Contact/Resident Engineer
Tim Watkins or Rob Greenfield
847-391-5464
publicworks@desplainesil.gov
Note: Bender Road project may be completed under a separate project. More information will be available at a later date.
| Location |
Limits |
Improvement |
| Arnold Ct. |
Florian Dr. to Dorothy Dr. |
8" Water Main |
| Dover Ln. |
Dover Dr. to Dover Dr. |
8" Water Main |
| Dover Dr. |
Marshall Dr. to Miami Ln. |
8" Water Main |
| Bender Rd. |
75 Bender Rd. to University Ave. |
12" Water Main |
| Golf Rd. |
401 Golf Rd. to 725 Golf Rd. |
8" Water Main |
| Shannon Ct. |
Golf Rd. to East End |
8" Water Main |
| Hills Ave. |
River Rd. to Grove Ave. |
8" Water Main |
| Sherman Pl. |
River Rd. to Grove Ave. |
8" Water Main |
When Will My Road be Repaired?
Learn more about the City's Capital Improvement Program for road and alley work. The table lists the road, project type and year. For questions, contact our Engineering team at 847-391-5390 or by email.
Please note all projects are subject to funding and City Council approval.
Frequently Asked Questions
Download the FAQ(PDF, 129KB).
Project Descriptions
Note that all projects are subject to change in scope or schedule due to permitting, funding and other factors.
Alley Repairs and Reconstruction
Repairs include replacement of deteriorated areas of alley pavement with concrete, pervious concrete or brick pavers. Full alley reconstruction includes removal of existing pavement and constructing pervious concrete pavement. Once construction begins, there will be no access to the driveways for approximately 3-4 weeks.
New Sidewalk
New sidewalk will be constructed in areas where none exists. Scope may include regrading of surrounding areas and adjacent ditches. Repairs of existing broken sidewalk may also be completed.
Street Reconstruction
Replace and widen pavement and base; replace curb and gutter, driveway aprons and various sidewalk; regrade parkways. For streets without existing curb and gutter, new curb and gutter will be constructed.
Street reconstruction work typically includes utility work. Construction takes place in phases and the duration can be several months.
Street Rehabilitation
Replace all pavement and driveway aprons; replace deteriorated curb and gutter; repair broken and hazardous sidewalk.
Street rehabilitation work typically includes utility work. Construction takes place in phases and the duration can be several months.
Street Resurface
Replace only the surface layer of the asphalt pavement. Project duration is typically less than one month.
Storm Sewer
Install new storm sewer (part of the City’s Stormwater Master Plan).
Storm Sewer installation projects typically include street rehabilitation or reconstruction. Construction takes place in phases and the duration can be several months.
Water Main
Install new water mains and fire hydrants; connect individual water services to the new main. Water service will be interrupted at various times and locations.
(Requires inspection of existing water meter and service lines for identification of lead service lines, in accordance with the State of IL Public Act 102-0613. Call Public Works to make an appointment for inspection at 847-391-5464.)
Water main installation projects typically include street rehabilitation or reconstruction. Construction takes place in phases and the duration can be several months.