2025 CIP Water Main Improvements, Contract A; Start Summer 2025

Point of Contact/Resident Engineer
Eric Heiker, P.E.
847-391-5617
eheiker@desplainesil.gov

Location Limits Improvement
Douglas Av Howard Av To South Dead End 8" Water Main; Street Reconstruction
Prospect Av Lee St To Illinois St 8" Water Main; Street Rehabilitation
Sixth Av Greenview Av To Prairie Av 8" Water Main; Street Rehabilitation

2025 CIP Street Improvements, MFT 25-00231-00-RS; Start Summer 2025

Point of Contact/Resident Engineer
Becka Shipp, PE
847-391-5388
bshipp@desplainesil.gov

Location Limits Improvement
Anita St Harvey Av To Washington St Resurface
Arlington Av Prairie Av To Laurel Av Resurface
Arnold Ct King Ln To Kinkaid Ct Resurface
Bittersweet Ct Mannheim Rd To Oakton St Resurface
Clark Ln Walnut Av To Kinkaid Ct Resurface
Columbia Av Anita St To Westgate Rd Resurface
Dale St Touhy Av To Estes Av Resurface
Evergreen Av Anita St To Westgate Rd Resurface
First Av Prairie Av To Greenview Av Resurface
Harding Av Anita St To Westgate Rd Resurface
Hazel Ct Ash St To Bittersweet Ct Resurface
Henry Av Center St To West Dead End Resurface
Ingram Pl Walnut Av To King Ln Resurface
Leahy Circle S Stark Pl To Clark Ln Resurface
Mary St Golf Rd To Redeker Rd Resurface
Munroe Circle S Marshall Dr To Clark Ln Resurface
N Fifth Av Golf Rd To North Dead End Resurface
Northshore Av Curtis St To Eisenhower Dr Resurface
Oakwood Av Center St To Lee St Resurface
Oakwood Av Third Av To Second Av Resurface
Orchard St Prospect Av To Howard Av Resurface
Parsons Av Prairie Av To Arlington Av Resurface
Rose Ave Fourth Av To First Av Resurface
Sycamore St Central Av To Pratt Av Resurface

2025 CIP Concrete Program, 25-00000-01-GM; Start Spring 2025

Point of Contact/Resident Engineer
Daniel Koltys, FE
847-391-5390
dkoltys@desplainesil.gov

Location Limits Improvement
Prospect Av/Howard Av Alley Pine St To Chestnut St Alley Improvements

2024 CIP Stormwater Improvements, Contract C; Start Summer 2024

Point of Contact/Resident Engineer
Becka Shipp, P.E.
847-391-5388
bshipp@desplainesil.gov

Location Limits Improvement
Craig Manor Park Craig Manor Park Storm Sewer Improvements
Madelyn Dr. 776 Madelyn Dr. to Therese Ter. Storm Sewer Improvements
Mark Ave. 758 Mark Ave. To Madelyn Dr. Storm Sewer Improvements

2024 CIP Water Main Improvements, Contract B; Start Summer 2024

Point of Contact/Resident Engineer
Tim Watkins or Rob Greenfield
847-391-5464
publicworks@desplainesil.gov

Note: Bender Road project may be completed under a separate project. More information will be available at a later date.

Location Limits Improvement
Arnold Ct. Florian Dr. to Dorothy Dr. 8" Water Main
Dover Ln. Dover Dr. to Dover Dr. 8" Water Main
Dover Dr. Marshall Dr. to Miami Ln. 8" Water Main
Bender Rd. 75 Bender Rd. to University Ave. 12" Water Main
Golf Rd. 401 Golf Rd. to 725 Golf Rd. 8" Water Main
Shannon Ct. Golf Rd. to East End 8" Water Main
Hills Ave. River Rd. to Grove Ave. 8" Water Main
Sherman Pl. River Rd. to Grove Ave. 8" Water Main

When Will My Road be Repaired?

Learn more about the City's Capital Improvement Program for road and alley work. The table lists the road, project type and year. For questions, contact our Engineering team at 847-391-5390 or by email.

Please note all projects are subject to funding and City Council approval.

Frequently Asked Questions

Download the FAQ(PDF, 129KB).

Project Descriptions

Note that all projects are subject to change in scope or schedule due to permitting, funding and other factors.

Alley Repairs and Reconstruction

Repairs include replacement of deteriorated areas of alley pavement with concrete, pervious concrete or brick pavers. Full alley reconstruction includes removal of existing pavement and constructing pervious concrete pavement. Once construction begins, there will be no access to the driveways for approximately 3-4 weeks.

New Sidewalk

New sidewalk will be constructed in areas where none exists. Scope may include regrading of surrounding areas and adjacent ditches. Repairs of existing broken sidewalk may also be completed.

Street Reconstruction

Replace and widen pavement and base; replace curb and gutter, driveway aprons and various sidewalk; regrade parkways. For streets without existing curb and gutter, new curb and gutter will be constructed.

Street reconstruction work typically includes utility work. Construction takes place in phases and the duration can be several months.

Street Rehabilitation

Replace all pavement and driveway aprons; replace deteriorated curb and gutter; repair broken and hazardous sidewalk.

Street rehabilitation work typically includes utility work. Construction takes place in phases and the duration can be several months.

Street Resurface

Replace only the surface layer of the asphalt pavement. Project duration is typically less than one month.

Storm Sewer

Install new storm sewer (part of the City’s Stormwater Master Plan).

Storm Sewer installation projects typically include street rehabilitation or reconstruction. Construction takes place in phases and the duration can be several months.

Water Main

Install new water mains and fire hydrants; connect individual water services to the new main. Water service will be interrupted at various times and locations.
(Requires inspection of existing water meter and service lines for identification of lead service lines, in accordance with the State of IL Public Act 102-0613. Call Public Works to make an appointment for inspection at 847-391-5464.)

Water main installation projects typically include street rehabilitation or reconstruction. Construction takes place in phases and the duration can be several months.